Change orders against a quote or a work order, with the running contract value built from what the client actually approved. You raise a change order against a quote or a work order, naming the client, the change in one line and, on the first one for that reference, the original contract value in minor units. Then you add the lines: added work with a quantity and a unit price, removed work the same way, and a changed line with what it was and what it is now. You move it to sent on the day it goes out, and to approved or rejected on the day the client answers, each step dated and a step dated before the last one refused. contract_value then answers the question the whole thing exists for: the original, plus the deltas the client APPROVED, equals the value today, with the draft and sent deltas shown apart and never added in. The original value is stated once per reference and inherited by every later change order, and a different figure is refused by name, because a contract with two original values has two running values and the customer sees whichever was typed last. No delta is stored: the delta, the VAT and the running value are derived from the lines on every call with the invoice server's own arithmetic. Lines go only on a draft; a sent change order that needs another line is voided and raised again, so the client's approval always refers to what they were sent, and a draft cannot be approved directly because approval is the client's answer to something they were sent. Once approved, the delta comes back as invoice_create items in major units and quote_create items in minor units in one call, and a changed line comes back as two items, the reversal and the revised line, never one net item, so both figures reproduce on a calculator from the change order the client signed. It creates no invoice and no quote of its own: the payload says posted false, and you run invoice_create in the invoice server.
The change is usually already in this window, in the client's own email asking for a second page or dropping the hosting, so reading the line, the quantity and the price out of it and into change_order_add_line is one sentence, with the client's words as the reason, and the question that follows, what is the contract worth now, is the next one. Nothing leaves the machine: the server makes no network call on any tool, so what a job was quoted at and how it changed stays on the laptop it was typed on.
| You say | Tool |
|---|---|
| Raise a change order against Q-2026-0003 for Harbour Cafe, original value 2,000,000 minor units: second landing page, drop hosting, widen the audit. | change_order_create |
| Add two landing pages at 45,000 each, remove twelve months of hosting at 3,999, and the audit was three at 45,000 and is now five at 42,000. Then mark it sent on 2026-03-12. | change_order_add_line |
| They approved it on 2026-03-15. What is Q-2026-0003 worth now, and build the invoice payload for the delta. | contract_value |
A changed line is two items, not one, because one net item shows the customer nothing they can check. A line that goes from 3 x EUR 450.00 to 5 x EUR 420.00 is worth +EUR 750.00, and the tempting payload is one item of quantity 1 at EUR 750.00, which reproduces from nothing on the change order the client signed. The payload this server emits is a reversal, -3 x 450.00, and the revised line, 5 x 420.00; each reproduces on a calculator, and the invoice server's own computeTotals over both is the same +750.00, because its roundHalfUp is symmetric in sign. That same symmetry carries a removal as a negative quantity through invoice_create, and it is what quote_create refuses, so the quote payload carries a ready flag instead of a promise. The worked change order runs the whole way through: added 90,000, removed 47,988, changed +75,000, delta net 117,012, VAT 26,913 per item, delta gross 143,925, rounding drift zero, and the contract goes from 2,000,000 to 2,117,012 only on the day the client approves. The unit suite then feeds the quote payload's minor figure into the invoice engine as though it were major and asserts the net is exactly 100x, 11,701,200 against 117,012, re-derived from each payload's own items, so the day someone simplifies the payload to one net item or moves a field between the scales, the build says so instead of the customer.
The file is claude_desktop_config.json, and the key inside it is mcpServers.
| Scope | Path |
|---|---|
| macOS | ~/Library/Application Support/Claude/claude_desktop_config.json |
| Windows | %APPDATA%\Claude\claude_desktop_config.json |
One click, with no JSON. Download change-order.mcpb from the
bundle catalog and open it. Claude Desktop installs it as an extension and runs
it on the Node runtime it ships with, so neither your PATH nor your node version comes into it, and there
is no file to edit. Everything below is the manual route, for when you want the entry in the config file
itself.
The config block, which needs both strings absolute:
{
"mcpServers": {
"change-order": {
"command": "node",
"args": ["/absolute/path/to/mcp-servers/servers/change-order/dist/index.js"]
}
}
}
If node came from nvm, asdf or homebrew, use the absolute path that which node prints
rather than the bare word, because a stdio server started by this app inherits a limited PATH:
"command": "/Users/you/.nvm/versions/node/v22.14.0/bin/node"
The node command above wants a built file. From a clone, once:
git clone https://github.com/theluckystrike/mcp-servers.git
cd mcp-servers && npm install
npm run build -w packages/mcp-license -w servers/change-order
That writes servers/change-order/dist/index.js, and its absolute path is the one argument
the config needs.
The npm packages are not published yet, so the form below returns a 404 today. It is here because it is what the entry becomes the day the publish lands, with nothing else changed:
{
"mcpServers": {
"change-order": {
"command": "npx",
"args": ["-y", "@theluckystrike/mcp-change-order"]
}
}
}
Save, then completely quit Claude Desktop and start it again. A window reload is not enough.
Nothing is published to npm yet, so the working install paths are the ones above: the .mcpb bundle from the bundle catalog, a clone and build, or the hosted URL.
The same server runs at https://mcp.zovo.one/mcp/change-order over MCP streamable HTTP, no install. Mint a free token with curl https://mcp.zovo.one/mcp/token, or use a Pro key. It has no filesystem, so a file comes back as a one-hour download link.
{
"mcpServers": {
"change-order": {
"url": "https://mcp.zovo.one/mcp/change-order",
"headers": { "Authorization": "Bearer <token>" }
}
}
}
Two documented facts decide whether the entry works: every path in claude_desktop_config.json must be absolute, and a stdio server started here inherits only a limited, platform-dependent subset of environment variables. If node came from nvm or homebrew, paste what `which node` prints instead of the bare word. The .mcpb route avoids both: Claude Desktop ships a built-in Node.js environment.
Free: Five OPEN change orders, draft and sent, and 200 lines on each of them on every tier. The cap counts the ones the client has not answered rather than the ones ever raised, so approving, rejecting or voiding one frees its slot, and change_order_delete on a draft with no lines is free on every tier as well, because a way back that only a Pro key can reach is not a way back. contract_value is free on every tier: the running value is the thing the change orders exist to answer, and withholding it would withhold the record. A byte-identical change order is refused before the cap is even consulted, so a double-typed change names the id already stored rather than being met with an upgrade prompt, and burns neither a slot nor a CO number. Pro is $19 once, verified offline.
macOS: ~/Library/Application Support/Claude/claude_desktop_config.json. Windows: %APPDATA%\Claude\claude_desktop_config.json. There is no published Linux path. Settings, Developer, Edit Config opens the right copy and creates it if it does not exist.
In order: did you fully quit and restart, not just close the window? Is every path absolute? And is the command resolvable, given the limited environment a stdio server inherits here? If node came from nvm, paste what which node prints.
Yes. An .mcpb bundle, the format renamed from .dxt, opens with Claude and shows an installation dialog. One you built yourself goes in through Settings, Extensions, Advanced settings, Install Extension.
MCP Change Order in detail · The same server in Claude.ai and Claude Desktop connectors and Claude Code · Every server in Claude Desktop · Guides · Claude Desktop docs · Buy Pro
Change orders and the running contract value from chat, and why a changed line is two items · Pricing a job from a rate card, and what to do when the scope changes